Here are the main technologies currently used in Australia to convert waste or biomass residues into fuel, heat or power. Click (i) to see the technology scheme and a case study.
The MSM Milling Biomass Fuel Switch Project involves replacing current LPG fuelled boilers with a 5MW biomass fuelled boiler using locally sourced timber residue as a fuel source. The installation of the new Biomass Boiler will displace several smaller existing LPG boilers and save around 4,000tCO2-e per annum and over 80,000tCO2-e for the Project life. The Project will produce 7,147kg/h of steam output at full capacity, to be used in milling and processing operations. The increased capacity to produce steam at a lower cost with a renewable resource will ensure the business can expand its operation without the risk of exposure to volatile LPG price fluctuations.
https://arena.gov.au/projects/msm-milling-biomass-fuel-switch/
Check the Biomass Producer Website for more Bioenergy case studies.
Do you need assistance?
Our consultants can help with your next bioenergy project! Click the arrow for contact details